{"id":1241,"date":"2022-06-28T13:41:05","date_gmt":"2022-06-28T20:41:05","guid":{"rendered":"http:\/\/www.ecoinc.info\/newsite\/?p=1241"},"modified":"2024-02-29T15:03:28","modified_gmt":"2024-02-29T23:03:28","slug":"environmental-assessment-of-175-buildings-at-us-army-garrison-yuma-proving-ground-ypg","status":"publish","type":"post","link":"http:\/\/www.ecoinc.info\/newsite\/environmental-assessment-of-175-buildings-at-us-army-garrison-yuma-proving-ground-ypg\/","title":{"rendered":"Environmental Assessment of 175 Buildings at US Army Garrison Yuma Proving Ground (YPG)"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"1241\" class=\"elementor elementor-1241\">\n\t\t\t\t\t\t<div class=\"elementor-inner\">\n\t\t\t\t<div class=\"elementor-section-wrap\">\n\t\t\t\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-bbf4714 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"bbf4714\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t\t\t<div class=\"elementor-row\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-632e8e5\" data-id=\"632e8e5\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-column-wrap elementor-element-populated\">\n\t\t\t\t\t\t\t<div class=\"elementor-widget-wrap\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-3fb474e elementor-widget elementor-widget-text-editor\" data-id=\"3fb474e\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t<div class=\"elementor-text-editor elementor-clearfix\">\n\t\t\t\t<p>U.S. Army Corps of Engineers (USACE) \u2013 Environmental Assessment of 175 Buildings at <br \/>U.S. Army Garrison Yuma Proving Ground (YPG)<br \/><i>USACE Los Angeles, 2015 \u2013 2018<\/i><\/p>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-328a1c1 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"328a1c1\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t\t\t<div class=\"elementor-row\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-55376ee\" data-id=\"55376ee\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-column-wrap elementor-element-populated\">\n\t\t\t\t\t\t\t<div class=\"elementor-widget-wrap\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-2832fb1 elementor-widget elementor-widget-text-editor\" data-id=\"2832fb1\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t<div class=\"elementor-text-editor elementor-clearfix\">\n\t\t\t\t<div>\u00a0<\/div><div><p class=\"MsoNormal\">This YPG\/USACE project was performed for a client in\u00a0preparation for building demolition activities and demonstrates Eco\u2019s\u00a0capability to mobilize and provide consistently safe, high-quality asbestos, and\u00a0LBP survey services for any size of the project assigned to us. Over a performance<br \/>period of 1,095 10-hour working days Eco conducted asbestos, LBP, mercury, polychlorinated biphenyls (PCBs), and sampling surveys for 175\u00a0structures ranging in size from 100 square <br \/>feet (SF) to 90,000 SF (1,018,000 SF\u00a0total). All materials suspected to contain asbestos in concentrations &gt;1%,\u00a0and LBP at concentrations \u2265 1.0 mg\/cm2 (tested via an XRF analyzer) <br \/>were\u00a0assessed. Confirmation dust wipe and paint chip sampling of asbestos and lead<br \/>was performed, where needed.<\/p><p class=\"MsoNormal\">In addition to developing a highly detailed Workplan, Eco\u00a0prepared a Site-Specific Sampling and Analysis Plan (SAP), Waste Management\u00a0Plan, Site-Specific\/Task-Specific Health and Safety Plan (HASP), and Quality\u00a0Assurance Surveillance Plan (QASP). We provided a total of 175 final reports<br \/>that included tables, figures (drawings\/maps), laboratory reports, photographs,\u00a0and certificates of qualified persons to document building descriptions, work\u00a0activities, and investigation results. After all work was approved and\u00a0finalized, a DVD was sent to the YPG that included a GIS file containing an\u00a0ArcMap of all the buildings, and a reports folder containing 818 PDF report\u00a0files <br \/>with executive summaries, figures, tables, and photos.<\/p><\/div>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-303ea7b elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"303ea7b\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t\t\t<div class=\"elementor-row\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-4f6acb6\" data-id=\"4f6acb6\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-column-wrap elementor-element-populated\">\n\t\t\t\t\t\t\t<div class=\"elementor-widget-wrap\">\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"U.S. Army Corps of Engineers (USACE) \u2013 Environmental Assessment of 175 Buildings at U.S. Army Garrison Yuma Proving Ground (YPG)USACE [&hellip;]","protected":false},"author":2,"featured_media":1448,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[],"class_list":["post-1241","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"_links":{"self":[{"href":"http:\/\/www.ecoinc.info\/newsite\/wp-json\/wp\/v2\/posts\/1241","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.ecoinc.info\/newsite\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.ecoinc.info\/newsite\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.ecoinc.info\/newsite\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/www.ecoinc.info\/newsite\/wp-json\/wp\/v2\/comments?post=1241"}],"version-history":[{"count":15,"href":"http:\/\/www.ecoinc.info\/newsite\/wp-json\/wp\/v2\/posts\/1241\/revisions"}],"predecessor-version":[{"id":1505,"href":"http:\/\/www.ecoinc.info\/newsite\/wp-json\/wp\/v2\/posts\/1241\/revisions\/1505"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.ecoinc.info\/newsite\/wp-json\/wp\/v2\/media\/1448"}],"wp:attachment":[{"href":"http:\/\/www.ecoinc.info\/newsite\/wp-json\/wp\/v2\/media?parent=1241"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.ecoinc.info\/newsite\/wp-json\/wp\/v2\/categories?post=1241"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.ecoinc.info\/newsite\/wp-json\/wp\/v2\/tags?post=1241"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}